30.59 MW · In DevelopmentYaru Khola Hydropower · Gorkha, Nepal

Power carved
from the Himalaya

Yaru Hydro Power develops utility-scale run-of-river hydropower across Nepal's river basins — engineering clean energy that powers homes, industry, and a zero-carbon national grid.

Installed capacity
30.59 MW
Installed capacity
Gross head
1,116 m
Gross head
Annual energy
177.21 GWh
Annual energy
0 MW
Installed capacity
0 m
Gross head
0 GWh
Annual energy
0 m³/s
Design discharge
Water route · headworks to gridYKHEP · Peaking Run-of-River · Gorkha
Weir
2,406 m
Concrete · 15 m crest
Settling basin
× 2
62 × 4 × 5.15 m
Approach tunnel
1,740 m
Inverted-D · 3.2 × 3.5 m
Headrace canal
220 m
Rectangular · 1.7 × 2.1 m
Forebay
38,000 m³
Peaking pond · 4 hrs/day
Penstock
2,529 m
Mild steel · Ø 1.3 – 1.0 m
Powerhouse
1,290 m
3 × Pelton · 10.20 MW each
NEA grid
132 kV
30 km · Borlang, Dhading
Run-of-River EngineeringPeaking SchemesHydrology & FeasibilityEIA & ComplianceElectro-Mechanical WorksGrid InterconnectionCommunity DevelopmentReservoir OperationsRun-of-River EngineeringPeaking SchemesHydrology & FeasibilityEIA & ComplianceElectro-Mechanical WorksGrid InterconnectionCommunity DevelopmentReservoir Operations
YKHEP · Layout SchematicNOT TO SCALE
WEIR · 2406 mSETTLING BASIN ×2APPROACH TUNNEL1,740 m · 3.2 × 3.5 m2,400 mFOREBAY · 38,000 m³PENSTOCKΔ 1,116 mPOWERHOUSE · 3× PELTONTAILRACE → YARU KHOLA132 kV → NEA GRID
The engineering

From 2,406 m weir
to grid in one drop

A peaking run-of-river scheme engineered around a 1,116 m gross head — water is diverted at the Yaru Khola and carried through a headrace tunnel down to the forebay, a 38,000 m³ peaking pond set below the tunnel, then dropped through Pelton turbines to deliver dependable evening peak power to the national grid.

Gross head
1,116 m

Net head 1,094.32 m — among the highest in Gandaki

Design discharge
3.28 m³/s

Q41.9% · 61 km² catchment at headworks

Turbines
3 × Pelton

10.20 MW each · 132 kV evacuation

Peaking
4 hrs/day

38,000 m³ forebay pond below the headrace tunnel

Why Yaru

Discipline is the
real renewable

Megawatts are the outcome. The work is hydrology, geology, community trust, and two decades of engineering judgement applied to every river we touch.

Our story & leadership
01

Engineering-led delivery

Hydrological modelling, geotechnical rigour, and disciplined construction management from feasibility to commissioning.

02

Built for the basin

Local employment, community development programs, and shared value for the regions that host our infrastructure.

Corporate dispatch

Latest from the portfolio

All press releases

No press releases published yet

Corporate announcements and project dispatches will appear here once published by the communications team.

Strategic ecosystem

The people behind the power

Meet the leadership
Pratap Gurung
Board member

Chairman

Pratap Gurung

phd holder

Pratap Gurung
Board member

Chairman

Pratap Gurung

phd holder

Pratap Gurung
Board member

Chairman

Pratap Gurung

phd holder

Pratap Gurung
Board member

Chairman

Pratap Gurung

phd holder

Operational footprint

Where we operate

Locations

Project & Company Map

Selected Location

Yaru Khola Hydroelectric Project — Gorkha

Kerauja, Sirdibas and Uiya, Gorkha District, Gandaki Province, Nepal

Latitude: 28.3014

Longitude: 84.9167